Up to 10 kW per rack the question is airflow management. Above 30 kW air physically runs out. And AI workloads now ask for over 100 kW per rack — at which point the conversation moves from air conditioning to pipework.

Power density is the number that determines everything else in the hall: ceiling height, the type of cooling, rack layout and whether there is a raised floor at all. It is stated in kilowatts per rack and often written into designs out of habit — “8 kW per rack” — without checking what will actually go into one.

The check is elementary and worth doing early. Air cooling carries heat by Q = m · cp · ΔT. At a typical supply-to-return difference of 12 °C, removing 1 kW of heat takes roughly 240 m³/h of air. Multiply by the rack power and it becomes clear where the numbers run out.

The three regimes

  • Up to 5–8 kW per rack. A classic hall with hot and cold aisles, supply under a raised floor, perimeter precision units. It works reliably, provided the aisles do not mix.
  • 8–20 kW per rack. Aisle containment becomes mandatory — cold or hot, depending on the layout. Without it you get recirculation: hot air from the rear travels around the rack and enters at the front, and the servers breathe their own exhaust.
  • 20–40 kW per rack. In-row coolers or rear-door heat exchangers. Air still works, but its path has to be short — the fans already consume a noticeable share of total power.
  • Above 40–50 kW per rack. Direct-to-chip liquid cooling. Air remains only for the residual 10–20 % of the heat.

The four errors a thermal camera finds

Before changing technology there is usually something to fix in what exists. Most halls run below their capability for the same reasons:

  • Missing blanking panels. Every free U in a rack without a blank is an opening through which hot air returns to the front. It is the cheapest measure with the largest effect and almost never completed.
  • Unsealed cable openings. Cut-outs in the raised floor where cables pass let cold air out where it is not wanted. Brush seals cost nothing.
  • Misplaced perforated tiles. Placed in the hot aisle, they mix the streams directly. A sheet of paper finds them.
  • Supply temperature set too low. Halls are widely held at 18 °C “to be safe”. ASHRAE recommends a range of 18–27 °C at the equipment inlet for classes A1–A4, and the allowable range for class A2 extends to 35 °C. Every degree upward is energy saved directly on cooling.

Raising the supply temperature is the most underrated measure. But it is done after containment, not before — in a hall with mixing, the hottest point is well above the average and the margin is needed. Separate the streams first, then raise the setpoint.

What AI workloads changed

A few years ago 20 kW per rack was high density. Today’s model-training systems work in an entirely different order of magnitude — a rack of current-generation accelerators draws over 100 kW, and announced platforms head towards several hundred. At those figures air cooling is not inefficient but physically impossible: the required flow cannot pass through the rack.

From there the hall stops being an air-conditioned room and becomes a hydraulic installation. There is a primary and a secondary loop separated by a coolant distribution unit, manifolds along the row, quick couplings to each server and — mandatory — leak detection with automatic isolation. The designer of such a hall solves problems of flow, pressure and temperature difference, not air change.

This has a direct consequence for the power side too. At 100 kW per rack the supply is no longer a few individual feeders but an overhead busway with tap-off boxes, in a configuration matching the hall’s redundancy. Conductor sizes, short-circuit currents and selectivity are all recalculated — the values have nothing in common with those of a 5 kW-per-rack hall.

The practical conclusion

Density is set at the start of design and checked against what will actually be installed, not against an average. A hall designed for 8 kW per rack is not upgraded to 30 kW by replacing the cooling units — the room, the distribution and the routes all change.

Where the intended use is unclear, the sensible approach is a mixed hall: the greater part at moderate density and a defined zone prepared for high density — with reinforced power and a liquid-cooling connection, even if it is not used immediately. The cost difference at construction is small; at retrofit it is several times over.